Unclaimed profileTo claim it, first create an account or log in. Only the person, organization or organisation holding the profile, or someone authorized to represent it, may apply. EkoPulse will review the application.
Irun
Territory · Municipality

Irun

Municipality of Gipuzkoa

Gipuzkoa, España

Irun is a municipality in Gipuzkoa on the Bidasoa river, on the border with France. This profile brings together municipal commitments, plans and initiatives on sustainable mobility, climate and renaturalisation. Budget allocations and commitments do not by themselves amount to implemented results.

11 recorded improvements

Impact
36
points accumulated
Reliability
D
Support for the information
Formulas and versions

Detail of score

The data are calculated with improvements, evidence and connections currently published in EkoPulse.

Model used for this calculation: Impact 2.0 · Reliability 1.3.

Impact: 36 points

Cumulative score

Provisional model: each improvement is assessed by its reach for this profile type, from symbolic to transformative. The same work counts once. Contributions are combined with diminishing returns, and relevant relationships are added. Evidence adds 0 direct Impact points. This does not measure tonnes or net impact.

The highest reach levels require human confirmation; until then they receive a conservative rating. New or edited improvements use a provisional level until their current text is reviewed. At municipal scale, overlap between improvements acting on the same area is also limited.

11 sustainable improvements (weighed by their reach)+35.7
0 improvements with evidence+0
0 ecosystem connections+0
Profile’s own base36
Ecosystem influence+0
Total impact36

The own base combines practices and direct relationships. Direct relationships and ecosystem influence together add at most 4 points. Ecosystem influence can extend up to 3 steps away and depends on relationship trust and nearby profiles’ data. A disputed relationship transmits no influence through the graph, although it can retain direct credit if its category is eligible. Relationships do not generate negative points.

The advisory thresholds are 25 profiles with improvements, 5 with at least 25 points and at least one reaching 95 points. The current figures are 8, 5 and 79, respectively. Reaching these thresholds does not activate comparison: it requires a model decision.

Reliability: D

4 / 100

The model first places the information in a band according to its supporting evidence. It then calculates the score within that band.

Insufficient documentary support

Applicable band0–49
Coverage: 0 of 11 improvements with evidence
Band baseline0
Practice coverage+0
Source diversity+0
Documentary support+0
Source independence+0
Corroboration+0
Profile information+3.92
Direct relationships+0
Ecosystem support+0
Total reliability4 / 100

Contributions are shown rounded; the total uses the original calculation before final rounding. Ecosystem support is already included and is not added again. Under the current model, the maximum attainable is B+ (84/100).

See the full calculation →

Evolution of the score

The history shows saved snapshots, not a live calculation. Each snapshot retains the model used to calculate it; a model change does not by itself mean the profile’s activity changed.

010203040Impact · points · eje izquierdo · 1/9/2026, 0:46:03 UTC: 24Impact · points · eje izquierdo · 1/9/2026, 3:04:28 UTC: 24Impact · points · eje izquierdo · 2/9/2026, 3:04:28 UTC: 24Impact · points · eje izquierdo · 8/9/2026, 14:49:22 UTC: 31Impact · points · eje izquierdo · 11/9/2026, 3:53:46 UTC: 310255075100Reliability · sobre 100 · eje derecho · 1/9/2026, 0:46:03 UTC: 3Reliability · sobre 100 · eje derecho · 1/9/2026, 3:04:28 UTC: 3Reliability · sobre 100 · eje derecho · 2/9/2026, 3:04:28 UTC: 3Reliability · sobre 100 · eje derecho · 8/9/2026, 14:49:22 UTC: 4Reliability · sobre 100 · eje derecho · 11/9/2026, 3:53:46 UTC: 4Updated model · 1.41 Sep 266 Sep 2611 Sep 26

Two different scales; the heights of the curves cannot be compared.

Updated model · Discontinuity indicates a change in methodology.

View snapshots and methodology

Two different scales, the same dates. Only recorded snapshots are shown; earlier scores are not reconstructed.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Catch (UTC)ImpactReliabilityModel
1/9/2026, 00:46:03243 (D)1.3
1/9/2026, 03:04:28243 (D)1.3
2/9/2026, 03:04:28243 (D)1.3
8/9/2026, 14:49:22314 (D)1.4
11/9/2026, 03:53:46314 (D)1.4

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Impact Reference

Provisional reference · small sample

  • This profile35.7
  • Mean profile Impact39

Sample: 8 territories with a public score. There are not enough profiles yet to calculate an upper group. These references are based on a still small sample. As participation increases, they will become more representative and robust.

Sustainable improvements

11 recorded improvements · A selection to get started

Mobility

Mobility
Irun Sustainable Urban Mobility Plan (PMUS) Added by EkoPulseIrun City Council has a Sustainable Urban Mobility Plan drawn up between 2010 and 2011, whose stated objectives are to increase road safety in public space, reduce emissions and noise in urban space and increase non-motorised travel.

Ecosystem

Ecosystem
Renaturalization of the Dunboa canal Added by EkoPulseIrun City Council included in General Budgets 2025 a share of 500,000 euros for the re-naturalization work of Dunboa Canal.

Community and persons

Community and persons
Internal process of alignment with the 2030 Agenda Added by EkoPulseAt the end of 2021, the City Council discussed an internal analysis of its contribution to the 2030 Agenda and SDGs. Four working groups (People, Economy, Territory and Governance) were formed, in 2022 training sessions were given to technical, managerial and political staff, and the findings were presented to the Government Team at the end of 2022.
Metrics

Impact and reliability over time

The history shows saved snapshots, not a live calculation. Each snapshot retains the model used to calculate it; a model change does not by itself mean the profile’s activity changed.

010203040Impact · points · eje izquierdo · 1/9/2026, 0:46:03 UTC: 24Impact · points · eje izquierdo · 1/9/2026, 3:04:28 UTC: 24Impact · points · eje izquierdo · 2/9/2026, 3:04:28 UTC: 24Impact · points · eje izquierdo · 8/9/2026, 14:49:22 UTC: 31Impact · points · eje izquierdo · 11/9/2026, 3:53:46 UTC: 310255075100Reliability · sobre 100 · eje derecho · 1/9/2026, 0:46:03 UTC: 3Reliability · sobre 100 · eje derecho · 1/9/2026, 3:04:28 UTC: 3Reliability · sobre 100 · eje derecho · 2/9/2026, 3:04:28 UTC: 3Reliability · sobre 100 · eje derecho · 8/9/2026, 14:49:22 UTC: 4Reliability · sobre 100 · eje derecho · 11/9/2026, 3:53:46 UTC: 4Updated model · 1.41 Sep 266 Sep 2611 Sep 26Registered · Irun Ciudad 30 · 2026-09-01Registered · Zona de Bajas Emisiones (ZBE) de Irun · 2026-09-01Registered · Firma de la Carta de Aalborg (2000) · 2026-09-01Registered · Plan de Movilidad Urbana Sostenible (PMUS) de Irun · 2026-09-01Registered · Proceso interno de alineación con la Agenda 2030 · 2026-09-01Registered · Adhesión al Pacto de Alcaldes y Alcaldesas (desde 2010) · 2026-09-01Registered · Proyecto piloto de carril bici (bidegorri) en la Avenida de Navarra · 2026-09-05Registered · Presupuesto 2025: 1,3 millones de euros para movilidad sostenible y la Zona de Bajas Emisiones · 2026-09-05Registered · Renaturalizacion del canal de Dunboa · 2026-09-05Registered · Presupuestos participativos 2025: 500.000 euros para ampliacion de bidegorris y adaptacion climatica · 2026-09-05Registered · Recuperacion y puesta en valor del entorno de Irugurutzeta · 2026-09-05

Two different scales; the heights of the curves cannot be compared.

Updated model · Discontinuity indicates a change in methodology.

View snapshots and methodology

Two different scales, the same dates. Only recorded snapshots are shown; earlier scores are not reconstructed.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

The milestones distinguish the beginning of an action and its registration in EkoPulse. They do not automatically attribute a punctuation change to that action.

Catch (UTC)ImpactReliabilityModel
1/9/2026, 00:46:03243 (D)1.3
1/9/2026, 03:04:28243 (D)1.3
2/9/2026, 03:04:28243 (D)1.3
8/9/2026, 14:49:22314 (D)1.4
11/9/2026, 03:53:46314 (D)1.4

Consumption and other measurements

No public measurements are available for this profile yet.

Frameworks and recognitions

Contributions to the SDGs

Declared links

20 links to improvements

Do you know information about this profile?

Any registered person can provide information. There is no need to represent this organization or be verified.

Contribute information

Transparency and provenancei

Official information0
Community0
References in this section0

This count covers references added in this section; it excludes documents and evidence in other sections of the profile.

There are no posts or references in this section yet.