Unclaimed profileTo claim it, first create an account or log in. Only the person, organization or organisation holding the profile, or someone authorized to represent it, may apply. EkoPulse will review the application.
Universidad de Deusto
Organization · University

Universidad de Deusto

Private university with campus in Bilbao and Donostia. It has installed 161,28 kW of self-consumption photovoltaics in the Classroom and CRAI Bilbao (2026, with support from EVE and NextGenerationEU), calculated its h...

Bizkaia

Private university with campus in Bilbao and Donostia. It has installed 161,28 kW of self-consumption photovoltaic in the Classroom and CRAI Bilbao (2026, with support from EVE and NextGenerationEU), calculated its ecological footprint in 2013 as a base for "Deusto green campus" and was recognized in 2016 in the municipal program "Towards a new low carbon strategy".

2 recorded improvements

Impact
6
points accumulated
Reliability
D
Support for the information
Formulas and versions

Detail of score

The data are calculated with improvements, evidence and connections currently published in EkoPulse.

Model used for this calculation: Impact 2.0 · Reliability 1.3.

Impact: 6 points

Cumulative score

Provisional model: each improvement is assessed by its reach for this profile type, from symbolic to transformative. The same work counts once. Contributions are combined with diminishing returns, and relevant relationships are added. Evidence adds 0 direct Impact points. This does not measure tonnes or net impact.

The highest reach levels require human confirmation; until then they receive a conservative rating. New or edited improvements use a provisional level until their current text is reviewed.

2 sustainable improvements (weighed by their reach)+6.1
0 improvements with evidence+0
1 ecosystem connections+0.05
Profile’s own base6
Ecosystem influence+0
Total impact6

The own base combines practices and direct relationships. Direct relationships and ecosystem influence together add at most 4 points. Ecosystem influence can extend up to 3 steps away and depends on relationship trust and nearby profiles’ data. A disputed relationship transmits no influence through the graph, although it can retain direct credit if its category is eligible. Relationships do not generate negative points.

The advisory thresholds are 25 profiles with improvements, 5 with at least 25 points and at least one reaching 95 points. The current figures are 112, 34 and 72, respectively. Reaching these thresholds does not activate comparison: it requires a model decision.

Reliability: D

4 / 100

The model first places the information in a band according to its supporting evidence. It then calculates the score within that band.

Insufficient documentary support

Applicable band0–49
Coverage: 0 of 2 improvements with evidence
Band baseline0
Practice coverage+0
Source diversity+0
Documentary support+0
Source independence+0
Corroboration+0
Profile information+3.92
Direct relationships+0
Ecosystem support+0
Total reliability4 / 100

Contributions are shown rounded; the total uses the original calculation before final rounding. Ecosystem support is already included and is not added again. Under the current model, the maximum attainable is B+ (84/100).

See the full calculation →

Evolution of the score

The public record has just begun: for now there is only a catch to show an evolution. The next captures will be drawing how this score changes over time.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Impact Reference

  • This profile6.1499999999999995
  • Mean profile Impact19
  • Top 20%46

Sample: 112 organizations with a public score.

Sustainable improvements

2 recorded improvements

Energy

Energy
Photovoltaic self-consumption facilities in the Classroom and CRAI building of the Bilbao campus (161.28 kW, 2026) Added by EkoPulseAs part of its strategic plan to renovate installations and reduce emissions, the University of Deusto has installed 80.64 kW photovoltaic systems in the Classroom and CRAI building on its Bilbao campus (161.28 kW in total), with investments of 76,884,12 € and 59,286,44 € and aid of 11.007,36 € and 8,892,97 € from the programme of incentives for self-consumption (PRTR - NextGenerationEU), with the collaboration of EVE, MITECO and IDAE.

Other

Other
Calculation of the university's ecological footprint (2011-2012 academic year) as a basis for the "Deusto green campus" initiative Added by EkoPulseWith DeustoTech Energy, the University of Deusto calculated its ecological footprint for 2011-2012: 0.04 ha per inhabitant and per capita year and 0.05 ha global (the Bilbao campus is equivalent to 191 fields like the old San Mamés), as a first step in the "Deusto green campus" initiative.
Metrics

Impact and reliability over time

The history just started. The evolution shall be shown when at least two catches are recorded.

View snapshots and methodology

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Consumption and other measurements

No public measurements are available for this profile yet.

Frameworks and recognitions

Contributions to the SDGs

Declared links

3 links to improvements

Connected ecosystem
EVE
EVE
Organization · Basque Energy Agency - Basque Government Energy Agency
With the support of
Imported from EKONGRESO

Profile Factory pf-2026-09-12-rels-deusto-01

Do you know information about this profile?

Any registered person can provide information. There is no need to represent this organization or be verified.

Contribute information

Transparency and provenancei

Official information0
Community0
References in this section0

This count covers references added in this section; it excludes documents and evidence in other sections of the profile.

There are no posts or references in this section yet.