Unclaimed profileTo claim it, first create an account or log in. Only the person, organization or organisation holding the profile, or someone authorized to represent it, may apply. EkoPulse will review the application.
Bilbao Zerbitzuak
Organization · Public enterprise

Bilbao Zerbitzuak

Municipal society of the City of Bilbao that manages, among other services, the network of supply markets. He has carried out the energy transformation of the Ribera Market (cold for water, water, etc.).

Bizkaia

Municipal society of the City of Bilbao that manages, among other services, the network of supply markets. It has implemented the energy transformation of the Ribera Market (cold for water, photovoltaics and battery); 30% self-consumption) and installed solar panels in the markets of Ensanche and Otxarkoaga (2024).

3 recorded improvements

Impact
24
points accumulated
Reliability
D
Support for the information
Formulas and versions

Detail of score

The data are calculated with improvements, evidence and connections currently published in EkoPulse.

Model used for this calculation: Impact 2.0 · Reliability 1.3.

Impact: 24 points

Cumulative score

Provisional model: each improvement is assessed by its reach for this profile type, from symbolic to transformative. The same work counts once. Contributions are combined with diminishing returns, and relevant relationships are added. Evidence adds 0 direct Impact points. This does not measure tonnes or net impact.

The highest reach levels require human confirmation; until then they receive a conservative rating. New or edited improvements use a provisional level until their current text is reviewed.

3 sustainable improvements (weighed by their reach)+24
0 improvements with evidence+0
0 ecosystem connections+0
Profile’s own base24
Ecosystem influence+0
Total impact24

The own base combines practices and direct relationships. Direct relationships and ecosystem influence together add at most 4 points. Ecosystem influence can extend up to 3 steps away and depends on relationship trust and nearby profiles’ data. A disputed relationship transmits no influence through the graph, although it can retain direct credit if its category is eligible. Relationships do not generate negative points.

The advisory thresholds are 25 profiles with improvements, 5 with at least 25 points and at least one reaching 95 points. The current figures are 112, 34 and 72, respectively. Reaching these thresholds does not activate comparison: it requires a model decision.

Reliability: D

4 / 100

The model first places the information in a band according to its supporting evidence. It then calculates the score within that band.

Insufficient documentary support

Applicable band0–49
Coverage: 0 of 3 improvements with evidence
Band baseline0
Practice coverage+0
Source diversity+0
Documentary support+0
Source independence+0
Corroboration+0
Profile information+3.92
Direct relationships+0
Ecosystem support+0
Total reliability4 / 100

Contributions are shown rounded; the total uses the original calculation before final rounding. Ecosystem support is already included and is not added again. Under the current model, the maximum attainable is B+ (84/100).

See the full calculation →

Evolution of the score

The public record has just begun: for now there is only a catch to show an evolution. The next captures will be drawing how this score changes over time.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Impact Reference

  • This profile24
  • Mean profile Impact19
  • Top 20%46

Sample: 112 organizations with a public score.

Sustainable improvements

3 recorded improvements

Energy

Energy
Energy transformation of the Ribera market: industrial cold by water, photovoltaics and battery (2022-2025) Added by EkoPulseBased on the Schema Director of the Municipal Market Network (2021), Bilbao Zerbitzuak implemented a new industrial cold system based on water instead of polluting refrigerant gases (2022), a solar photovoltaic facility (2023) with battery (2024) and monitoring by app, with a budget of €1,558.201 (2023-2025). Photovoltaic produced 220.26 MWh (30.24% of the 728.38 MWh consumed), avoiding 137.32 t CO2.
Energy
Installation of solar panels in the Ensanche Market (2024-2025) Added by EkoPulseAs part of measures to reduce energy costs at municipal markets, Bilbao Zerbitzuak installed solar panels at Mercado del Ensanche in 2024 (budget expenditure: 141.093,65 €); production of 104,71 MWh in 2024-2025 and 49,74 t of CO2 emissions avoided.
Energy
Installation of solar panels in the Otxarkoaga Market (2024-2025): 42% self-consumption Added by EkoPulseBilbao Zerbitzuak installed solar panels in the Otxarkoaga Market in 2024 (budget execution €136,655.95); in 2024-2025 the installation produced 119.52 MWh, 42.47% of the 281.44 MWh consumed by the market, avoiding 56.77 t CO2.
Metrics

Impact and reliability over time

The history just started. The evolution shall be shown when at least two catches are recorded.

View snapshots and methodology

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Consumption and other measurements

No public measurements are available for this profile yet.

Frameworks and recognitions

Contributions to the SDGs

Declared links

4 links to improvements

Do you know information about this profile?

Any registered person can provide information. There is no need to represent this organization or be verified.

Contribute information

Transparency and provenancei

Official information0
Community0
References in this section0

This count covers references added in this section; it excludes documents and evidence in other sections of the profile.

There are no posts or references in this section yet.